My kitchen has been finished for a few months now. Finally found some time to post some photos.
The design and all work was done by my friends Calder + Kevin of Creative Integrity.
Can't say enough about these guys - their ideas, skills and attention to details is stellar.
Just thrilled with their work.
1. Switched out cupboard doors for glossy white IKEA ones and counter for IKEA butcher block
2. Installed microwave above oven to double the counter space
3. Built storage above
4. Switched out appliances for new stainless steel ones
5. Installed potlights and 2 pendant lights
6. Installed white subway tile backsplash
Calder suggested I continue the subway tile on the right side wall - and so glad he did.
Love how it looks!
The lights were a gift from my friends Sasha + Al and were salvaged from the Brooklyn Shipyards! I think the rust on them matches well with the old timey feel of the subway tile and warms up the glossy white.
This next Before and After shows a good view of the storage above
BEFORE
AFTER
Here are some process shots
The design and all work was done by my friends Calder + Kevin of Creative Integrity.
Can't say enough about these guys - their ideas, skills and attention to details is stellar.
Just thrilled with their work.
BEFORE
Problemos
1. Sad + ugly cupboards + counter
2. No counter space
3. Wasted space above
4. Ugly appliances
5. No lighting
6. No back splash
4. Ugly appliances
5. No lighting
6. No back splash
AFTER!
Changes1. Switched out cupboard doors for glossy white IKEA ones and counter for IKEA butcher block
2. Installed microwave above oven to double the counter space
3. Built storage above
4. Switched out appliances for new stainless steel ones
5. Installed potlights and 2 pendant lights
6. Installed white subway tile backsplash
Another angle
Love how it looks!
The lights were a gift from my friends Sasha + Al and were salvaged from the Brooklyn Shipyards! I think the rust on them matches well with the old timey feel of the subway tile and warms up the glossy white.
This next Before and After shows a good view of the storage above
AFTER
Here are some process shots
The storage half built
The talented Calder +Kevin of Creative Integrity hard at work
Calder doing a very precise job of the subway tile